Brochure on Status of all sites of the LAN project (as reported in mid Oct.08 to DGSM): Meeting
of Nodal Officers with Nominated Officers, Local officers and |
||
Details of sites | ||
Site
1 Aziz nagar |
Divisions: | |
Site 2 Ellapillaichavady | Ranges : Pondicherry-I-A, II-B | |
Site 3 Saaram | Ranges: Pondicherry-I-B, I-C, I-D, I-E | |
Site
4 Brindavan |
Ranges: Pondicherry-II-A, II-C, II-D, II-E | |
Site 5 Shringeri Mutt St |
Ranges: Pondichery-III-A, III-B,
III-C, III-D, III-E |
|
Site 6 Beach Road |
Hqrs.Office | |
Site
7 Cuddalore |
Cuddalore Division and Ranges: I, II, III, IV. | |
Site 8 Vriddhachalam |
Range Vriddchalam | |
Site
9 Villupuram |
Division Villupuram & Range | |
Site
10 Kallkurichi |
Range Kallakurichi | |
Site
11 Madhuranthagam |
Ranges Madhuranthagam I and II | |
Site
12 Tiruvannamalai |
Range Tiruvannamalai | |
Location / Building /
Office |
Common to All Sites |
Exceptions
|
Completion of Site Survey | Yes | Nil |
Identification of Communication Room | Yes (Divisions: yes; | For Hqrs.Office, shifting to annexe building's ground floor is planned; CPWD to be reminded before renovation work is started |
Any shifting of Office premises involved |
No, except >> |
Hqrs. Office: No
change; but the office space is proposed to be re-aligned and therefore DG
Systems had been requested to supply and implement LAN equipments at
the last phase of the project,
Tiruvannamalai : Office premises to be shifted within 3 months; proposal pending with CPWD. |
Supply
of Thin Clients/other peripherals |
Already supplied at many places at the specified quantities | Not yet supplied to Pondy-I Divn's all Ranges, Hqrs.Office, Cuddalore Divison/Ranges and Villupuram Division/Ranges.[ List for Hqrs sent to DGSM] |
Correctness of certificate of availablity of space for DG sets |
Space available; consent of landlords awaited. Letter received by house-owners from M/s.HP or Nodal officer | No space at two sites in Pondicherry (RangeIA,2B / Range 2A,2C,2D,2E) and Vriddhachalam Range ; At Tiruvannamalai, Range office is shifting. |
Connectivity for stand-alone range offices : provision of broadband ADSL connnection. |
Available at all formations /offices | Kallakurichi Range (facility in waiting) |
Redeployment of PCs | If all the existing workload and functions are not switched over to ACES project immediately and existing computers are converted to thin clients without retaining popular O/S and office applications to carry out remaining workflow not covered by the ACES project and their local storage, office productivity will suffer to the extent of 80% workload. Hence it is suggested that by conversion of existing PC's into thin clients, the users may please be allowed to use existing windows or linux based desktop environment office applications and to store/save documents in local machines for output in printed forms. | |
Whether any civil or elect. works being carried out which may affect LAN implementation | No civil works; | Hqrs.office: Tested WAN location requires a shift due to office re-alignment); A/C facility available; Civil work to be done that will disturb LAN installation. |
Anti Rodent / Pest Control | To be ascertained and undertaken | At Hqrs. and Local Divisinal Office building, problems need to be solved. |
Availability of safe storage space for equipments | Yes.. Exceptions >> |
For
Tiruvannamalai Range, suggested for delivery of materials at
Divisional office, Villupuram.
Hqrs.Office
= Informed stoppage of delivery of Materials, since space not available
until office re-alignment work is completed. However, advance supply of one
set of server + thin client + other lan equipments before
start of realignment work and further supply of balance mateirlas after
completion of re-alignment, has been requested for so that......** |
** so that hqrs. office space can be re-aligned with new workstations and thereafter the WAN equipments and the Server Room is shifted to the new room in the same campus. However, in such a contingency, there is a possibility that the Hqrs. office can not see the documents posted on the ACES by the Divisional & Range officers, owing to LAN installation in Divisions ahead of Hqrs.Office. Thus, the Hqrs.office's change management team will be left behind in understanding the package and the hardware usage; it is therefore desired that one set of server + thin client + scanner + network printer may be supplied to Hqrs.Office for tentative installlation at the existing communication room for learning purpose, so that the officers in charge of change management team at Hqrs.Office may take part in earlier training schedule and can lead the Divsions and Ranges. |